{"id":61,"date":"2006-12-17T16:48:40","date_gmt":"2006-12-17T15:48:40","guid":{"rendered":"http:\/\/www.buran-energia.com\/blog\/2006\/12\/17\/nouvelles-images\/"},"modified":"2009-05-27T15:50:06","modified_gmt":"2009-05-27T13:50:06","slug":"nouvelles-images","status":"publish","type":"post","link":"https:\/\/www.buran-energia.com\/blog\/2006\/12\/17\/nouvelles-images\/","title":{"rendered":"New pictures"},"content":{"rendered":"<p>New photos on the Buran-Energia project, in the <a href=\"http:\/\/www.buran-energia.com\/bourane-buran\/bourane-photos.php?file_dbt_=1\">Buran&#8217;s pictures<\/a> section:<\/p>\n<ul>\n<li>Carriage on the Energia&#8217;s top tank by the VM-T Atlante plane.<\/li>\n<li>Assembling of the first stage boosters.<\/li>\n<li>Tests on Buran and Energia on the launch pad, at this stage the shuttle is not finished yet.<\/li>\n<li>Carriage of Buran and Energia on the launch pad.<\/li>\n<li>Preparation for the flight.<\/li>\n<li>Storage of Buran 1.01 after its first flight.<\/li>\n<\/ul>\n<table border=\"0\" style=\"text-align: center\">\n<tr>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/030-transport-carriage-006487_buran_09.jpg\"><img decoding=\"async\" id=\"image53\" alt=\"Transport\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/030-transport-carriage-006487_buran_09.miniature.jpg\" \/><\/a><\/td>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/050-assemblage-et-tests-assembling-and-tests-006487_buran_03.jpg\"><img decoding=\"async\" id=\"image54\" alt=\"Assemblage\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/050-assemblage-et-tests-assembling-and-tests-006487_buran_03.miniature.jpg\" \/><\/a><\/td>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/050-assemblage-et-tests-assembling-and-tests-bbur92.jpg\"><img decoding=\"async\" id=\"image56\" alt=\"Pas de tir\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/050-assemblage-et-tests-assembling-and-tests-bbur92.miniature.jpg\" \/><\/a><\/td>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/070-sur-le-pas-de-tir-on-the-launch-pad-18174706.jpg\"><img decoding=\"async\" id=\"image58\" alt=\"Pas de tir\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/070-sur-le-pas-de-tir-on-the-launch-pad-18174706.miniature.jpg\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/070-sur-le-pas-de-tir-on-the-launch-pad-18174656.jpg\"><img decoding=\"async\" id=\"image57\" alt=\"Pas de tir\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/070-sur-le-pas-de-tir-on-the-launch-pad-18174656.miniature.jpg\" \/> <\/a><\/td>\n<td><a href=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/093-stockage-storage-006487_buran_04.jpg\"><img decoding=\"async\" id=\"image59\" alt=\"Stockage\" src=\"http:\/\/www.buran-energia.com\/blog\/wp-content\/uploads\/2006\/12\/093-stockage-storage-006487_buran_04.miniature.jpg\" \/><\/a><\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>New photos on the Buran-Energia project, in the Buran&#8217;s pictures section: Carriage on the Energia&#8217;s top tank by the VM-T Atlante plane. Assembling of the first stage boosters. Tests on Buran and Energia on the launch pad, at this stage the shuttle is not finished yet. Carriage of Buran and Energia on the launch pad. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,5,2],"tags":[],"class_list":["post-61","post","type-post","status-publish","format-standard","hentry","category-bourane","category-energia","category-2"],"_links":{"self":[{"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/posts\/61","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/comments?post=61"}],"version-history":[{"count":1,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/posts\/61\/revisions"}],"predecessor-version":[{"id":504,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/posts\/61\/revisions\/504"}],"wp:attachment":[{"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/media?parent=61"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/categories?post=61"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buran-energia.com\/blog\/wp-json\/wp\/v2\/tags?post=61"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}